Projects

Companysort icon Location Remarks Status Year
E.C. CALDERON LAPU-LAPU CITY, CEBU

ON-STREAM INSPECTION (OSI) OF SPHERE TANK 15

Completed 2011
ECOLOGY SPECIALIST, INC. SAN RAFAEL, BULACAN

ON-STREAM INSPECTION OF DISTILLATION TANK SHELL PLATES, ROOF PLATES AND NOZZLES INCLUDING APPURTENANCES

Completed 2011
ELLIMETAL BATANGAS

UT OF NEWLY ERECTED SILO TANKS

Completed 2013
FARLAND STEEL BULACAN

UT FLAW OF BIFURCATION PIPES

Completed 2013
FLOBAR CONSTRUCTION AND SUPPLY LOWER CALARIAN, ZAMBOANGA CITY

RADIOGRAPHIC TESTING, MAGNETIC PARTICLE INSPECTION, AND VACUUM TESTING OF TANK 2

Completed 2011
FRAVINZ ENTERPRISE SILANG, CAVITE

DPT OF STRUCTURAL STEEL

Completed 2015
GCC/SINOMA ALBAY

RT OF BOILER TUBES

Completed 2009
GCR LAGUNA

RT OF LPG TANK 1 & 2

Completed 2008
GCR ENGINEERING 229 BALTHAZAR EXT., 10TH AVE., CALOOCAN CITY

DPT, UT LAMINATION CHECK & WITNESSING OF HYDRO TEST FOR MIXING TANK # 1 & 2

Completed 2011
GCR ENGINEERING 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY

DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE RE-QUALIFICATION CERTIFICATE OF MIXING TANK # 3

Completed 2011
GCR ENGINEERING 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY

DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE REQUALIFICATION CERTIFICATE OF MIXING TANK # 4

Completed 2011
GCR ENGINEERING 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY

DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE REQUALIFICATION CERTIFICATE OF MIXING TANK # 5

Completed 2011
GCR ENGINEERING 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY

DPT, UT LAMINATION CHECK AND WITNESSING OF HYDROSTATIC TESTING OF MIXING TANK # 6

Completed 2011
GLAXO SMITH KLEIN CAINTA RIZAL

OOSI OF 38 TANKS

Completed 2008
HAGAFEA SBMA

UNDERWATER WELDING INSPECTION

Completed 2009
HEDCOR DAVAO

RT OF PIPES FOR PLANT & PLANT B HYDROPOWER PLANT

Completed 2009
HIPULAN CONST. TAGOLOAN

OOSI OF SPHERE TANK B

Completed 2007
HIPULAN CONSTRUCTION BAJADA, DAVAO CITY

NDT OF LPG TANK # 1 & LPG SERVICE PIPELINE

Completed 2011
HOPE MANAGEMENT & ENGINEERING SERVICES SUBIC, ZAMBALES

ULTRASONIC FLAW DETECTION TESTING ON SHIP SIDE SHELL

Completed 2012
HRD(S) PTE. LTD. ROSARIO, CAVITE

ULTRASONIC FLAW DETECTION OF ELEVATED WATER TANK 1

Completed 2011
JAPAN GAS CORP. ALABANG, MUNTINLUPA

WELDER'S QUALIFICATION TEST (WQT)

Completed 2012
JFE CE & CONST SBMA, ZAMBALES

ULTRASONIC TESTING OF PIPE PILES

Completed 2007
JGC ALABANG

WQT OF TEST PIPES

Completed 2010
JGC PHILS DAVAO

WELDERS QUALIFICATION

Completed 2008
JGC PHILS., INC. BATARAZA, PALAWAN

RADIOGRAPHIC TESTING (WQT) OF TEST PIPES

Completed 2011
JGC PHILS., INC. MUNTINLUPA CITY

WELDER'S QUALIFICATION TEST OF VARIOUS TEST PIPES

Completed 2013
JGC PHILS., INC. MUNTINLUPA CITY

WELDER'S QUALIFICATION TEST OF VARIOUS TEST PIPES

Completed 2014
JRT CONSTRUCTION AND TRADING CORP. LOT 2 E. RODRIGUEZ AVE., MOONWALK VILLAGE, PARAÑAQUE CITY

VISUAL INSPECTION REPORT OF THE STEEL POLES

Completed 2011
KEPCO ILIJAN POWER ILIJAN, BATANGAS

OOSI OF TANK A, B & C

Completed 2014
KMP ENGINEERING LAPU-LAPU

XRAY OF DEMINERALIZED WATER TANK

Completed 2008