REGISTERED COMPANY: |
![]() |
Projects
Company |
Location![]() |
Remarks | Status | Year | |
---|---|---|---|---|---|
ARS & MARKETING | # 5 ESPERANZA ST., DON PEDRO VILLAGE, MARULAS, VALENZUELA |
ON-STREAM INSPECTION (OSI) OF SQUARE TANK (AST) |
Completed | 2011 | |
GCR ENGINEERING | 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY |
DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE RE-QUALIFICATION CERTIFICATE OF MIXING TANK # 3 |
Completed | 2011 | |
GCR ENGINEERING | 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY |
DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE REQUALIFICATION CERTIFICATE OF MIXING TANK # 4 |
Completed | 2011 | |
GCR ENGINEERING | 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY |
DYE PENETRANT TESTING, ULTRASONIC TESTING LAMINATION CHECK AND THE REQUALIFICATION CERTIFICATE OF MIXING TANK # 5 |
Completed | 2011 | |
GCR ENGINEERING | 229 BALTAZAR EXT., 10TH AVE., CALOOCAN CITY |
DPT, UT LAMINATION CHECK AND WITNESSING OF HYDROSTATIC TESTING OF MIXING TANK # 6 |
Completed | 2011 | |
GCR ENGINEERING | 229 BALTHAZAR EXT., 10TH AVE., CALOOCAN CITY |
DPT, UT LAMINATION CHECK & WITNESSING OF HYDRO TEST FOR MIXING TANK # 1 & 2 |
Completed | 2011 | |
ROBLETT INTERNATIONAL CONSTRUCTION CORP. | 836 MARIA CLARA ST., MANDALUYONG CITY |
RADIGRAPHIC TESTING OF TEST PIPE |
Completed | 2011 | |
ALLIED INSPECTION CORROSION SERVICE (ALINCOR) | 92-A RIZAL STREET CALAMBA CITY, LAGUNA |
HOLIDAY TESTING OF POLY UREA LINING MBR TANK # 2 |
Completed | 2011 | |
JGC | ALABANG |
WQT OF TEST PIPES |
Completed | 2010 | |
SHILOH INTERNATIONAL | ALABANG, MUNTINLUPA |
DPT & UTG OF HIGH PRESSURE PIPELINE |
Completed | 2012 | |
JAPAN GAS CORP. | ALABANG, MUNTINLUPA |
WELDER'S QUALIFICATION TEST (WQT) |
Completed | 2012 | |
GCC/SINOMA | ALBAY |
RT OF BOILER TUBES |
Completed | 2009 | |
CALTEX PHILS. | AMLAN, MINDORO, LA UNION, PANDACAN, PASIG, LAPU-LAPU, BATANGAS |
RT OF TANK |
Completed | 2007 | |
CHEVRON PHILS. | APALIT, BATANGAS, JIMENEZ, PASIG |
UT OF PIPELINES |
Completed | 2008 | |
TF. BOTONES | ARANETA, TANDANG SORA, PASAY, SAN LAZARO |
RT OF PIPES 1”, 1 ¼”, 1 ½”, 2” DIA. |
Completed | 2007 | |
PHIL. GOLD PROCESSING | AROROY, MASBATE |
MPI OF BALL MILL #2 FEED TRUNNION FLANGE |
Completed | 2015 | |
SIEMENS POWER | ATA. RITA, BATANGAS |
RT OF SHORT OUTAGE FOR UNIT 30, 50 & 60 |
Completed | 2014 | |
TDK | BACOLOD |
REMOTE VISUAL INSPECTION/BORESCOPE OF PIPES |
Completed | 2007 | |
PHOENIX PETROLEUM PHILS., INC. | BACOLOD |
RADIOGRAPHIC TESTING AND MAGNETIC TESTING OF ADO TANK (25.0 METER DIA.), IFO TANK (13.56 METER DIA.) & MOGAS TANK (19.38 METER DIA.) |
Completed | 2011 | |
SVG | BACOLOD |
OOSI OF TANK 2 |
Completed | 2014 | |
MMC ENG'G WORKS (SVG) | BACOLOD CITY |
OOSI / MFL OF TANK 3 (29M DIA.) |
Completed | 2013 | |
PRYCE GASES | BACOLOD, CAGAYAN, QUEZON CITY |
REQUALIFICATION OF LPG LORRY TANKS |
Completed | 2007 | |
TOA CORP. | BAESA, Q.C. |
RT OF PIPE PILE |
Completed | 2007 | |
HIPULAN CONSTRUCTION | BAJADA, DAVAO CITY |
NDT OF LPG TANK # 1 & LPG SERVICE PIPELINE |
Completed | 2011 | |
SHILOH INT’L | BATAAN |
SUPPLY OF WELDING INSPECTOR, RADIOGRAPHY OF TEST PIPES/PLATES |
Completed | 2009 | |
SHILOH INT’L. | BATAAN |
SUPPLY OF WELDING INSPECTOR, PREPARE WPS, PQR, MECHANICAL TEST, NDT |
Completed | 2007 | |
TOTAL PHILS. CORP. | BATAAN |
OOSI / MFL OF TANK A4, B2, B3 & B4 |
Completed | 2012 | |
TOTAL BULK CORP. (TBC) | BATANGAS |
OOSI / MFL OF TANK 810 & 809 |
Completed | 2012 | |
REDBALL TECHNICAL INC. | BATANGAS |
ULTRASONIC FLAW DETECTION OF BOX COLUMN 1-6 |
Completed | 2013 | |
ELLIMETAL | BATANGAS |
UT OF NEWLY ERECTED SILO TANKS |
Completed | 2013 |